luglio 2009residence frusaglia
Delivered the electrical and mechanic plant of the residence frusaglia...
20.05.2009 section 2
Delivered the electrical and mechanic plant of the " Section 2" in the new quarter San&nbs...
RIMINI - AUTOMATION SYSTEM WATERS DRAINAGE
29 LUGLIO 2009
The scope of the job was to replace the old electromechanical electrical board (45 users) with a new electrical board d' managed automation is in the electromechanical classic modality but also through TOUCH-PANEL and control from remote through telephone net GSM. The development software and all l' engineering has been cured completely from our technical office.In the photo below the electrical local before and after the intervention.