Warning: include(connessione_db.php) [function.include]: failed to open stream: No such file or directory in /home/www/siti/poloimpianti/eng/pbgroup.php on line 2
Warning: include() [function.include]: Failed opening 'connessione_db.php' for inclusion (include_path='.:/usr/share/php:/usr/share/pear') in /home/www/siti/poloimpianti/eng/pbgroup.php on line 2 Polo Impianti
PROJECT DESCRIPTION
New production plant on 18,000 sq. m with 2,000 sq. m of office space.
SYSTEMS INSTALLED
● MT/BT (medium and low tension) transformer cabins
● electric device panels
● electrical installations
● Standard and emergency lighting systems
● External lighting system
● Smoke alarm system
● sound/data networks
● industrial heating unit
● office heating unit
● Water treatment unit
● Idronico air conditioning system
● Air treatment with heat recovery
● Internal factory floor heating system
● Fire alarm system
● Methane gas distribution system
● Plumbing system
● temperature regulating system
● hot water distribution installation for painting system
PARTICULARS
1 MT/BT (medium and low tension) transformer cabin with a total of 1200 installed KW.
Technological details: ● Offices: 240 thermal KW ● Industrial Unit: 900 thermal KW ● Paint line: 840 thermal KW
● Factory heating plant supported by Veissmann 978 KW furnaces.
● Pumps in various measurements for the distribution of thermal vector fluid for floor heating system.
● 17.000 sq. m of polyurethane paneling
● 66.000 ml of PeXc tubing served by 42 collectors in molded brass.
● Industrial unit power system with a supply circuit for the paint line with 840 KW thermal power, circuit balancing, mixer valve connection and utilizer link.
● Office heating plant supported by a Viessmann 248 KW furnace.
● Pumps in various measurements for the distribution of thermal vector fluid for air ducts and radiators.
● Heat recovery air treatment system.
● P3 ducts and FCR diffusers.
● IRSAP Radiators.
● CED Air conditioning.