PROJECT DESCRIPTION
New office structure built on three open levels done entirely in glass in order to maximize the use of natural light and minimize energy consumption.
SYSTEMS INSTALLED
● Centralized standard and emergency lighting systems
● Interlink, and built in (hidden) electrical installations at work stations
● Electrical system
● Controlled remote TVCC (closed circuit TV) external system on all sides of building
● Anti-intrusion system on all levels managed by a remote digital unit.
● Sanyo brand GHP methane heating system complete with Idronico.
● Winter heating system with RDZ floor panels.
● Summer cooling system with air exchange split channeled and directly connected to the GHP.